鋁合金蝸輪減速機 減速機安裝注意事項

鋁合金蝸輪減速機、安裝注意事項

  • 減速機要平穩安裝,避免震動。與機器裝配前,請檢查減速機的輸出軸的旋轉方向是否正確。
  • 在減速機放置時間長達四至六個月情況下,應檢查密封圈是否因不浸潤在潤滑油中而與軸發生粘連或失去彈性。
    必要時需更換密封圈確保運轉時的順暢。
  • 安裝空心軸時應採用專用力矩扳手。若無該條件時可自行選用專用工具,但應確保軸向不受力,減速機可自由移動。
  • 減速機應避免受日光直射和雨淋及確保通風條件良好,工作環境溫度低於 -5°C 或高於 40°C 時請諮詢技術服務部。
  • 皮帶盤、齒輪、聯軸器、軸等通過特殊螺紋孔裝于實心軸或空心軸,該螺紋孔可防止運作時損傷軸承和機件表面,
    應對機件表面作適當潤滑、以防鏽蝕和卡塞,橡膠件和透氣孔不可上油漆。
  • 安裝完畢後,取出油孔上的封口栓塞換上透氣栓塞及檢查油位高度。

  • 如果減速機不連接電機時,請參考以下注意事項以確保正確連接安裝於 B5、B14
  • 檢查軸與電機法蘭之公差是否符合基本標準。
  • 清洗軸中心孔和法蘭表面的汙跡及油漆。
  • 安裝時避免減速機受力。
  • 檢查馬達鍵槽的位置和偏差。
  • 用潤滑油塗抹軸的表面以防生鏽或卡塞。
  • 開機時應分級起動,不能滿負荷起動。
  • 裝配在電機下方的機件及材料易於受損,應採取適當的防範措施。


Install Reduction Notes

To install the reduction unit it is necessary to note the following recommendations.

  • The mounting on the machine must be stable to avoid any vibration. Check the correct direction of rotation of the reduction unit output shaft before fitting the unit to the machine.
  • In the case of particularly lengthy of periods of storage (4~6 months) if the oil seal is not immersed in the lubricant inside recommended changing it since the rubber could stick to the shaft or even has lost the elasticity it needs to function prober.
  • For a shaft mounting, for reduction units with a hollow output shafts, use the torque arms motion clinic can supply. If it is n make sure that the constraint is axially free and with such as play as to ensure free movement to the reduction unit.
  • Whenever possible, protect the reduction unit against solar radiation and bad weather.
  • Ensure the motor cools correctly by assuring good passage of air from the fan side.
  • In the case of ambient temperatures < -5°C and > +40°C contact motion clinic.
  • The various parts ( pulleys, gear wheels, couplings, shafts, etc.) must be mounted on the solid or hollow shafts using special holes or other systems that anyhow ensure correct operation without risking damage to the bearings or external parts of the units.
  • Painting must definitely not go over rubber parts and the holes on the breather plugs, if there are any.
  • Taking out the seal embolism of the oil hole.
  • Check the height of the oil level.
  • Supposing the gear unit has not coupled with the motor. Please pay attention to the following items to make sure rightly connection. Mounting to B5, B14.
  • Check whether the tolerance between the shaft and motor flange fit for the essential standard.
  • Washing the dirt and the paint on the surfaces of the shaft, center bore and the flange.
  • Mounting avoid the gear unit incur strength.
  • Check the position and the decimation of the motor key slot.
  • Lubricate the surfaces in contact to avoid seizure or oxidation.
  • Starting must take place gradually, without immediately applying the maximum load.
  • When there are parts objects or materials under the motor drive that can be damaged by even limited spillage of oil, special should be fitted.









亞鈦電機有限公司
台中市北屯區環中東路一段982-21號
TEL 04-2239-8158   FAX 04-2239-8108